Traceability of Excavated Material—T2A Tunnel
Client
Horizon Grand Paris & TEDELIS
The T2A tunnel project on the south section of the upcoming Paris Métro Line 15 involved building a 6.6 km section of railway tunnel between Villejuif–Louis Aragon and Créteil–L’Échat stations.
This portion of one of the Grand Paris Express lines included three types of earthwork: stations and ancillary structures; cast walls; and tunnel boring, generating over 1.4 million tonnes of excavated waste.
In terms of waste management, the major issue with such a large-scale project was the impossibility of repurposing excavated waste—it had to be disposed of entirely. Furthermore, the companies’ CSR policies and the legal framework pertaining to excavated waste management required them to track all removed material.
Project
Project ending March 2023
Solution
- Filing waste tracking forms from within the Ubysol application; sending the waste tracking forms to T-REX for archival;
- Streamlined issuing and rapid handling by non-experts;
- Selecting which data parameters were displayed on the mobile version when creating forms
Want to learn more ?
Whether you want to ask a question about our products or simply exchange on the subject, do not hesitate to get in touch with our teams