The European community of Alsace: Roadworks on RD 1004 – Wasselonne

The European community of Alsace: Roadworks on RD 1004 – Wasselonne

Monitoring of disturbances caused by the 1004 departemental road  roadworks Client The road between Strasbourg and Wasselonne, about 20 kilometers long, is very busy and congested at peak times (18,000 to 24,000 vehicles per day on average). Until now, this has been...
Horizon Grand Paris: Line 15 South – T3A Tunnel

Horizon Grand Paris: Line 15 South – T3A Tunnel

Monitoring of multi-service vehicles in the Line 15 South Section T3A Tunnel Project As part of the Grand Paris Express project, the construction of the line 15 South tunnel is divided into several sctions. The one named T3A, 4.2 kilometres long, links the Pont de...
Dragages Singapore: Glory Tower – Singapore

Dragages Singapore: Glory Tower – Singapore

Production and workforce monitoring in a 51-floor tower Project The 280m high Glory Tower project, located in the heart of Singapore’s business district, has 51 floors. Construction began in 2017 and was completed in 2021. This building program has 29 floors of...